http://rfs-rf.ru/upload/medialibrary/c1a/prilozhenie-1-k-resheniyu-gkrch-_-16_36_03.pdf

Note that there was never a DFS requirement in Russia, but always was
NO-OUTDOOR on 5GHz.
Maximum power is 200mW that is ~23dBm on all 5GHz channels.
Also Russia has never been regulated by ETSI.

EIRP has been reduced by 4dBm because of TPC requirement.

Signed-off-by: Dmitry Tunin <hanipouspi...@gmail.com>
---
 db.txt | 12 +++++-------
 1 file changed, 5 insertions(+), 7 deletions(-)

diff --git a/db.txt b/db.txt
index 37393e6..9e4dc27 100644
--- a/db.txt
+++ b/db.txt
@@ -1097,14 +1097,12 @@ country RS: DFS-ETSI
        # 60 GHz band channels 1-4, ref: Etsi En 302 567
        (57000 - 66000 @ 2160), (40)
 
-country RU: DFS-ETSI
-       (2402 - 2482 @ 40), (20)
-       (5170 - 5250 @ 80), (20), AUTO-BW
-       (5250 - 5330 @ 80), (20), DFS, AUTO-BW
-       (5650 - 5730 @ 80), (30), DFS
-       (5735 - 5835 @ 80), (30)
+country RU:
+       (2400 - 2483.5 @ 40), (20)
+       (5150 - 5350 @ 160), (20), NO-OUTDOOR
+       (5650 - 5850 @ 160), (20), NO-OUTDOOR
        # 60 GHz band channels 1-4, ref: Changes to NLA 124_Order 
???129_22042015.pdf
-       (57000 - 66000 @ 2160), (40)
+       (57000 - 66000 @ 2160), (40), NO-OUTDOOR
 
 country RW: DFS-FCC
        (2402 - 2482 @ 40), (20)
-- 
2.7.4

Reply via email to