On Mon, Dec 14, 2009 at 11:34 AM, Tobias Appel <[email protected]> wrote: > Hi, > > I'm thinking about doing an upgrade of my Heartbeat 2.1.4 installation > to Pacemaker. > I had a look at this site: http://www.clusterlabs.org/wiki/Upgrade > > And now I'm wondering if the information is still up-to-date.
That part is. > > It says for Rolling Upgrade: > > This method is currently broken between Pacemaker 0.6.x and 1.0.x > > So does this mean I upgrade my Cluster to Pacemaker 0.6.x and then I'm > stuck and can't go to 1.0.x ? > > Am I only left with the Disconnect & Reattach option then? Yes. > > I think I don't need much from the current configuration anyway, You can keep the configuration, you just can't have 0.6 and 1.0 running in the same cluster. > basically I have only one group of resources and a few constraints for > DRBD. I could use the Disconnect & Reattach way and go directly to > Pacemaker 1.0.x and just create a new configuration, or can't I? Sure. _______________________________________________ Linux-HA mailing list [email protected] http://lists.linux-ha.org/mailman/listinfo/linux-ha See also: http://linux-ha.org/ReportingProblems
