On Mon, Dec 14, 2009 at 11:34 AM, Tobias Appel <[email protected]> wrote:
> Hi,
>
> I'm thinking about doing an upgrade of my Heartbeat 2.1.4 installation
> to Pacemaker.
> I had a look at this site: http://www.clusterlabs.org/wiki/Upgrade
>
> And now I'm wondering if the information is still up-to-date.

That part is.

>
> It says for Rolling Upgrade:
>
> This method is currently broken between Pacemaker 0.6.x and 1.0.x
>
> So does this mean I upgrade my Cluster to Pacemaker 0.6.x and then I'm
> stuck and can't go to 1.0.x ?
>
> Am I only left with the Disconnect & Reattach option then?

Yes.

>
> I think I don't need much from the current configuration anyway,

You can keep the configuration, you just can't have 0.6 and 1.0
running in the same cluster.

> basically I have only one group of resources and a few constraints for
> DRBD. I could use the Disconnect & Reattach way and go directly to
> Pacemaker 1.0.x and just create a new configuration, or can't I?

Sure.
_______________________________________________
Linux-HA mailing list
[email protected]
http://lists.linux-ha.org/mailman/listinfo/linux-ha
See also: http://linux-ha.org/ReportingProblems

Reply via email to