Not sure it is worth the post, but this is what I have accomplished since
Monday.



Mostly preparation of the tip end of the wing and tank on the left wing,
Tuesday and Wednesday, and Friday.



Thursday, I went to OGB to visit Matt and check out his work on the canopy
installation.  While I was there, he made a couple of nice fittings for the
fuel drain thingys.



So I started today by gluing in the ( got my T-88 yesterday) re-enforcement
plywood on the spars at the tip end of the tank and set that (left) wing
aside to start doing all the same stuff all over again on the right wing,
with the addition of some final clean up from the existing glass tank that
was in this wing.



I accomplished my goal, which was to get the stub end mounted.  The pic is
at the bottom of:



http://krbuilder.org/ConvertingToWingTanks/index.html



Tomorrow, I will be back at it again and hope to get the tip end of the left
wing mounted.



Daniel R. Heath