I flipped my fuselage today to do the surface prep and final paint on the 
bottom.  It will be upside down for about a month until the bottom is 
complete through final paint.  The weather was bad so I did not take very 
many pictures but I will add more when it gets turned over.

My flipping rig is similar to others I have seen on some of the KR web 
pages, but I made mine wider than most.  Mine is attached at the main spar 
with the wing attachment fittings and some brackets that I welded up out of 
scrap.  It is also attached to the fire wall and has lots of bracing.

I had a total of nine people (and my wife watching the show).  If I add 
wheels to the top (which is now on the ground) of the structure, it can be 
done with as few as four or five.



Don Reid  -  donreid "at" peoplepc.com
Bumpass, Va

Visit my web sites at:

AeroFoil, a 2-D Airfoil Design And Analysis Computer Program:
http://aerofoilengineering.com

KR2XL construction: http://aerofoilengineering.com/KR/KR2XL.htm
Aviation Surplus: http://aerofoilengineering.com/PartsListing/Airparts.htm
EAA Chapter 231: http://eaa231.org
Ultralights: http://usua250.org
VA EAA State Fly-in: http://vaeaa.org



Reply via email to