Netters

Quick update:  Finished installing th dual stick assembly to satsify the 
Inspector's requirement to have the mounting brackets re-made, and have them 
made out of 4130 steel instead of aluminum.  Don't shoot me for the weight, it 
is not my idea but his, and I am going the path of least resistance.  Plus 
there is alot of security in this set, thank you Brian Kraut for selling it to 
me. Will be posting pictures as soon as time permits.

Corrected the stud/nut holddown situation.  Why it was that way from the start 
I don't know but it is now seated all the way into the self locking nut.  Also 
corected the 360 strees loop in the oil pressure supply line, and fed it 
through a rubber grommett where it passes through the baffling.

All that is left is the wiring re-organizing under the cowling, and the cover 
for the battery, and call him back out!

Getting very close, now if I could just get some sleep....

Colin & Bev Rainey
KR2(td) N96TA
Sanford, FL
crain...@cfl.rr.com
http://kr-builder.org/Colin/index.html

Reply via email to