Netters Quick update: Finished installing th dual stick assembly to satsify the Inspector's requirement to have the mounting brackets re-made, and have them made out of 4130 steel instead of aluminum. Don't shoot me for the weight, it is not my idea but his, and I am going the path of least resistance. Plus there is alot of security in this set, thank you Brian Kraut for selling it to me. Will be posting pictures as soon as time permits.
Corrected the stud/nut holddown situation. Why it was that way from the start I don't know but it is now seated all the way into the self locking nut. Also corected the 360 strees loop in the oil pressure supply line, and fed it through a rubber grommett where it passes through the baffling. All that is left is the wiring re-organizing under the cowling, and the cover for the battery, and call him back out! Getting very close, now if I could just get some sleep.... Colin & Bev Rainey KR2(td) N96TA Sanford, FL crain...@cfl.rr.com http://kr-builder.org/Colin/index.html