This is how I did it. I did not try to cover the gaps for the elevator as they are closed and cannot be inspected. I may consider doing something like this for the elevator, in the future, if I ever decide that I want to inspect or replace those bolts.
http://kr-builder.org/ElevatorControl/NewPics/rudderfairings.html This is also available off the main drop down menu on the home page. There is a time for building and a time for flying, and the time for building has long since expired. See N64KR at http://KR-Builder.org - Then click on the pics Daniel R. Heath - Columbia, SC See you in Mt. Vernon - 2004 - KR Gathering See our EAA Chapter 242 at http://EAA242.org