Thanks Brian. This is certainly a valid perspective on the deadline 
situation. The possibility of a $300 solution is not at all farfetched.
Chris K

On 6/8/2016 2:48 PM, brian.kraut--- via KRnet wrote:
>
> Personally, I am going to wait at least a few years.  I deal with
> electronics for large commercial ships for a living and I have been
> through very many mandatory new equipment requirements (several dozen at
> least) and every time it is the same story.  Calls of panic from the
> regulators and the equipment manufacturers that equipment prices may go
> up and ship owners may not be able to get equipment or installation in
> time if they wait till close to the deadline.  This is followed by
> newer, better, and less expensive equipment being introduced by lots of
> manufacturers, then followed by major price cuts as all the
> manufacturers try to get as much of the market share as possible.  Would
> not surprise me at all if there are $300 solutions readily available
> before the deadline.
>


Reply via email to