https://bugs.kde.org/show_bug.cgi?id=458020
Bug ID: 458020 Summary: Changing calendar/agenda of existing task with subtasks results in ‘dirty’ akonadi pimitems Product: kalendar Version: 22.04.3 Platform: Gentoo Packages OS: Linux Status: REPORTED Severity: normal Priority: NOR Component: general Assignee: claudio.cam...@gmail.com Reporter: bugs.kde....@e3q.eu CC: c...@carlschwan.eu Target Milestone: --- SUMMARY I changed the calendar/agenda of an existing task with subtasks (using the top selectbox in the task editing window). The main task seemed to change calendar/agenda (color change), but it subtasks didn't (no color change, still visualized as subtasks). Afterwards, it turned out that it had created a mess, as the subtasks became ‘dirty’ akonadi pimitems (messing with any further synchronization) and the main item apparently reverted to the original calendar/agenda. STEPS TO REPRODUCE 1. Change calendar/agenda of an existing task with subtasks OBSERVED RESULT Subtasks become dirty; whole operation fails in the end EXPECTED RESULT Whole subtree rooted in changed task is moved to calendar/agenda the main task was changed to SOFTWARE/OS VERSIONS KDE Plasma Version: 5.24.6 KDE Frameworks Version: 5.90.0 Qt Version: 5.15.5 -- You are receiving this mail because: You are watching all bug changes.