I feel like I must be doing something wrong here, but I have a Pipeline job 
that is getting its definition from version control.  The Pipeline defines 
parameters that the user has to supply.  If I change the set of parameters 
I want the build to have, I seem to have to run a failed job first to get 
the Pipeline re-parsed and then I can see the new parameters I defined.  Is 
there a better way to let the Pipeline job know about new parameters 
without letting a job run with incorrect or missing parameters?

-- 
You received this message because you are subscribed to the Google Groups 
"Jenkins Users" group.
To unsubscribe from this group and stop receiving emails from it, send an email 
to jenkinsci-users+unsubscr...@googlegroups.com.
To view this discussion on the web visit 
https://groups.google.com/d/msgid/jenkinsci-users/f8db5183-e16a-4316-b995-2726f9625a4c%40googlegroups.com.
For more options, visit https://groups.google.com/d/optout.

Reply via email to