Issue Type: New Feature New Feature
Assignee: Unassigned
Components: p4
Created: 05/Sep/14 8:34 PM
Description:

With the current plugin functionality, if multiple changes a committed around the same time, only the last changelist is built. This is the proper behavior for nightly/full builds, but for incremental build it would be nice if there was a way to build each committed change sequentially.

We use incremental builds to provide quick feedback to developers. Being able to build sequentially is helpful b/c jenkins will be able to say "your change broke the build" instead of "one of the 7 changes that were made between the 3 of you since the last time I polled broke the build".

Environment: Jenkins version 1.575
P4 plugin version 1.0.12
Project: Jenkins
Priority: Major Major
Reporter: Michael Rose
This message is automatically generated by JIRA.
If you think it was sent incorrectly, please contact your JIRA administrators.
For more information on JIRA, see: http://www.atlassian.com/software/jira

--
You received this message because you are subscribed to the Google Groups "Jenkins Issues" group.
To unsubscribe from this group and stop receiving emails from it, send an email to [email protected].
For more options, visit https://groups.google.com/d/optout.

Reply via email to