[
https://issues.apache.org/jira/browse/SPARK-61114?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]
Ruifeng Zheng reassigned SPARK-61114:
-------------------------------------
Assignee: Ruifeng Zheng
> Run the full matrix in sampled post-merge CI
> --------------------------------------------
>
> Key: SPARK-61114
> URL: https://issues.apache.org/jira/browse/SPARK-61114
> Project: Spark
> Issue Type: Improvement
> Components: Project Infra
> Affects Versions: 5.0.0
> Reporter: Ruifeng Zheng
> Assignee: Ruifeng Zheng
> Priority: Major
> Labels: pull-request-available
>
> Post-merge CI on master is now sampled at one in ten commits, but selected
> runs still use a reduced upstream job selection.
> Enable the complete existing build_and_test.yml job matrix on selected
> upstream pushes by passing an explicit all-enabled jobs selection from
> build_main.yml. Keep build_and_test.yml and its existing per-job module/test
> filtering unchanged. Preserve change-based job selection for fork builds and
> existing scheduled workflow configurations.
> This extends the sampling infrastructure from SPARK-61016 and PR #60177.
> Implementation: https://github.com/apache/spark/pull/60203
--
This message was sent by Atlassian Jira
(v10.3.26#10030026)
---------------------------------------------------------------------
To unsubscribe, e-mail: [email protected]
For additional commands, e-mail: [email protected]