[
https://issues.apache.org/jira/browse/MRESOLVER-7?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=17626936#comment-17626936
]
wei cai commented on MRESOLVER-7:
---------------------------------
[~Chealer]
You may find more details in
https://issues.apache.org/jira/browse/MRESOLVER-247 about the BF + Skipper.
> Download dependency POMs in parallel in BF collector
> ----------------------------------------------------
>
> Key: MRESOLVER-7
> URL: https://issues.apache.org/jira/browse/MRESOLVER-7
> Project: Maven Resolver
> Issue Type: Improvement
> Components: Resolver
> Affects Versions: Aether 1.0.2
> Reporter: Harald Wellmann
> Assignee: Tamas Cservenak
> Priority: Major
> Fix For: 1.9.0
>
> Attachments: resolve_deps.png, resolver.log
>
> Time Spent: 40m
> Remaining Estimate: 0h
>
> h3. Background
> When building a project with dependencies not yet available in the local
> repository, I noticed that Maven 3.3.9/Aether 1.0.2 first downloads the
> dependency POMs _sequentially_ and then proceeds downloading the dependency
> JARs with up to 5 threads _in parallel_.
> Due to this, when first building a project with a large number of
> dependencies, downloading a large number of small POMs may take a lot longer
> than downloading the much larger JARs, or even longer than building the
> project itself, especially when a repository manager is used which increases
> the download latency.
> h3. Enhancement
> Download POMs of (transitive) dependencies in parallel to significantly speed
> up initial builds of large projects.
--
This message was sent by Atlassian Jira
(v8.20.10#820010)