[
https://issues.apache.org/jira/browse/IGNITE-7786?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]
Dmitry Sherstobitov updated IGNITE-7786:
----------------------------------------
Summary: Changing baseline topology on cluster may have error in control.sh
utility (was: Changing baseline topology on big cluster may have error in
control.sh utility)
> Changing baseline topology on cluster may have error in control.sh utility
> --------------------------------------------------------------------------
>
> Key: IGNITE-7786
> URL: https://issues.apache.org/jira/browse/IGNITE-7786
> Project: Ignite
> Issue Type: Bug
> Affects Versions: 2.3
> Reporter: Dmitry Sherstobitov
> Priority: Major
>
> Looks like there is hardcoded timeout for waiting result of change baseline
> operation
> In big cluster there is following behaviour: (154 nodes)
> # Set new baseline topology version
> # Utility connects, but then fails by connection error
> # Cluster successfully activated
--
This message was sent by Atlassian JIRA
(v7.6.3#76005)