[ 
https://issues.apache.org/jira/browse/IGNITE-29027?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

Anton Vinogradov updated IGNITE-29027:
--------------------------------------
    Summary: IEP-132: Close Phase 0 by linking the acceptance demonstrations to 
the epic  (was: IEP-132 Phase 0: acceptance run — link the demonstrations, 
close the epic)

> IEP-132: Close Phase 0 by linking the acceptance demonstrations to the epic
> ---------------------------------------------------------------------------
>
>                 Key: IGNITE-29027
>                 URL: https://issues.apache.org/jira/browse/IGNITE-29027
>             Project: Ignite
>          Issue Type: Task
>            Reporter: Anton Vinogradov
>            Priority: Major
>              Labels: iep-132
>
> The closing work of the phase: run the demonstrations of the Accepted-when 
> checklist, put a link against every line in the epic description, then close 
> the epic.
> The checklist:
> - The dev-list [VOTE] thread exists, closed with a counted result (R1.7).
> - The accepted text names the baseline commit and the two change paths (R1.7).
> - The charter page links the thread (R1.7).
> Phase 0 of IEP-132. Done last, after every other ticket of the epic.



--
This message was sent by Atlassian Jira
(v8.20.10#820010)

Reply via email to