[ https://issues.apache.org/jira/browse/HIVE-15886?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=15862664#comment-15862664 ]
Hive QA commented on HIVE-15886: -------------------------------- Here are the results of testing the latest attachment: https://issues.apache.org/jira/secure/attachment/12852234/HIVE-15886.1.patch {color:red}ERROR:{color} -1 due to no test(s) being added or modified. {color:red}ERROR:{color} -1 due to 4 failed/errored test(s), 10236 tests executed *Failed tests:* {noformat} TestDerbyConnector - did not produce a TEST-*.xml file (likely timed out) (batchId=235) org.apache.hadoop.hive.cli.TestEncryptedHDFSCliDriver.testCliDriver[encryption_join_with_different_encryption_keys] (batchId=159) org.apache.hadoop.hive.cli.TestMiniLlapLocalCliDriver.testCliDriver[vector_if_expr] (batchId=140) org.apache.hadoop.hive.cli.TestPerfCliDriver.testCliDriver[query14] (batchId=223) {noformat} Test results: https://builds.apache.org/job/PreCommit-HIVE-Build/3508/testReport Console output: https://builds.apache.org/job/PreCommit-HIVE-Build/3508/console Test logs: http://104.198.109.242/logs/PreCommit-HIVE-Build-3508/ Messages: {noformat} Executing org.apache.hive.ptest.execution.TestCheckPhase Executing org.apache.hive.ptest.execution.PrepPhase Executing org.apache.hive.ptest.execution.ExecutionPhase Executing org.apache.hive.ptest.execution.ReportingPhase Tests exited with: TestsFailedException: 4 tests failed {noformat} This message is automatically generated. ATTACHMENT ID: 12852234 - PreCommit-HIVE-Build > LLAP: Provide logs URL for in-progress and completed task attemtps > ------------------------------------------------------------------ > > Key: HIVE-15886 > URL: https://issues.apache.org/jira/browse/HIVE-15886 > Project: Hive > Issue Type: Bug > Components: llap > Affects Versions: 2.2.0 > Reporter: Prasanth Jayachandran > Assignee: Prasanth Jayachandran > Attachments: HIVE-15886.1.patch > > > YARN provides a webservice to access logs with YARN-6011. This can be used to > populate the in-progress and completed task attempts logs. -- This message was sent by Atlassian JIRA (v6.3.15#6346)