[ 
https://issues.apache.org/jira/browse/HIVE-13490?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=15339193#comment-15339193
 ] 

Lefty Leverenz commented on HIVE-13490:
---------------------------------------

[~kgyrtkirk], in the docs there's one sentence I don't understand:

bq.  And by having -Pitests around you are always compiling the integrations 
tests to...this can improve compile time error detection.

Should "to..." be "too..."?  Or is something omitted?

* [FAQ -- Why isn't the itests pom connected to the root pom? | 
https://cwiki.apache.org/confluence/display/Hive/HiveDeveloperFAQ#HiveDeveloperFAQ-Whyisn'ttheitestspomconnectedtotherootpom?]

> Change itests to be part of the main Hive build
> -----------------------------------------------
>
>                 Key: HIVE-13490
>                 URL: https://issues.apache.org/jira/browse/HIVE-13490
>             Project: Hive
>          Issue Type: Improvement
>            Reporter: Siddharth Seth
>            Assignee: Zoltan Haindrich
>             Fix For: 2.2.0
>
>         Attachments: HIVE-13490.01.patch, HIVE-13490.02.patch, 
> HIVE-13490.03.patch
>
>
> Instead of having to build Hive, and then itests separately.
> With IntelliJ, this ends up being loaded as two separate dependencies, and 
> there's a lot of hops involved to make changes.
> Does anyone know why these have been kept separate ?



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)

Reply via email to