[ https://issues.apache.org/jira/browse/HIVE-13490?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=15339193#comment-15339193 ]
Lefty Leverenz commented on HIVE-13490: --------------------------------------- [~kgyrtkirk], in the docs there's one sentence I don't understand: bq. And by having -Pitests around you are always compiling the integrations tests to...this can improve compile time error detection. Should "to..." be "too..."? Or is something omitted? * [FAQ -- Why isn't the itests pom connected to the root pom? | https://cwiki.apache.org/confluence/display/Hive/HiveDeveloperFAQ#HiveDeveloperFAQ-Whyisn'ttheitestspomconnectedtotherootpom?] > Change itests to be part of the main Hive build > ----------------------------------------------- > > Key: HIVE-13490 > URL: https://issues.apache.org/jira/browse/HIVE-13490 > Project: Hive > Issue Type: Improvement > Reporter: Siddharth Seth > Assignee: Zoltan Haindrich > Fix For: 2.2.0 > > Attachments: HIVE-13490.01.patch, HIVE-13490.02.patch, > HIVE-13490.03.patch > > > Instead of having to build Hive, and then itests separately. > With IntelliJ, this ends up being loaded as two separate dependencies, and > there's a lot of hops involved to make changes. > Does anyone know why these have been kept separate ? -- This message was sent by Atlassian JIRA (v6.3.4#6332)