[ https://issues.apache.org/jira/browse/HIVE-11777?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=14989082#comment-14989082 ]
Hive QA commented on HIVE-11777: -------------------------------- Here are the results of testing the latest attachment: https://issues.apache.org/jira/secure/attachment/12770394/HIVE-11777.05.patch {color:green}SUCCESS:{color} +1 due to 1 test(s) being added or modified. {color:red}ERROR:{color} -1 due to 6 failed/errored test(s), 9768 tests executed *Failed tests:* {noformat} org.apache.hadoop.hive.cli.TestCliDriver.testCliDriver_tez_union_with_udf org.apache.hadoop.hive.cli.TestHBaseCliDriver.testCliDriver_hbase_queries org.apache.hadoop.hive.cli.TestMiniLlapCliDriver.testCliDriver_tez_union_with_udf org.apache.hadoop.hive.cli.TestNegativeCliDriver.testNegativeCliDriver_authorization_uri_import org.apache.hadoop.hive.hwi.TestHWISessionManager.testHiveDriver org.apache.hive.jdbc.TestSSL.testSSLVersion {noformat} Test results: http://ec2-174-129-184-35.compute-1.amazonaws.com/jenkins/job/PreCommit-HIVE-TRUNK-Build/5911/testReport Console output: http://ec2-174-129-184-35.compute-1.amazonaws.com/jenkins/job/PreCommit-HIVE-TRUNK-Build/5911/console Test logs: http://ec2-174-129-184-35.compute-1.amazonaws.com/logs/PreCommit-HIVE-TRUNK-Build-5911/ Messages: {noformat} Executing org.apache.hive.ptest.execution.TestCheckPhase Executing org.apache.hive.ptest.execution.PrepPhase Executing org.apache.hive.ptest.execution.ExecutionPhase Executing org.apache.hive.ptest.execution.ReportingPhase Tests exited with: TestsFailedException: 6 tests failed {noformat} This message is automatically generated. ATTACHMENT ID: 12770394 - PreCommit-HIVE-TRUNK-Build > implement an option to have single ETL strategy for multiple directories > ------------------------------------------------------------------------ > > Key: HIVE-11777 > URL: https://issues.apache.org/jira/browse/HIVE-11777 > Project: Hive > Issue Type: Bug > Reporter: Sergey Shelukhin > Assignee: Sergey Shelukhin > Attachments: HIVE-11777.01.patch, HIVE-11777.02.patch, > HIVE-11777.03.patch, HIVE-11777.04.patch, HIVE-11777.05.patch, > HIVE-11777.patch > > > In case of metastore footer PPD we don't want to call PPD call with all > attendant SARG, MS and HBase overhead for each directory. If we wait for some > time (10ms? some fraction of inputs?) we can do one call without losing > overall perf. > For now make it time based. -- This message was sent by Atlassian JIRA (v6.3.4#6332)