[ https://issues.apache.org/jira/browse/HIVE-23203?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Miklos Gergely updated HIVE-23203: ---------------------------------- Status: Patch Available (was: Open) > Dummy jira for modifying ptest configuration - before the actual patch > ---------------------------------------------------------------------- > > Key: HIVE-23203 > URL: https://issues.apache.org/jira/browse/HIVE-23203 > Project: Hive > Issue Type: Test > Components: Hive > Reporter: Miklos Gergely > Priority: Major > Attachments: HIVE-23203.patch > > > If the ptest configuration is required to be modified, then the server must > be restarted, which causes the actually processed patch to fail. In order not > to cause trouble to others, this dummy Jira can be used by queueing this > first, then the actual modification, finally the pair of this Jira. > When the patch for this one is is processed, the ptest configuration can be > modified, and the server can be restarted, thus this dummy jira's patch > processing will fail. Then the actual modification comes, which will result > in some way or the other. Then the other dummy Jira > ([HIVE-23204|https://issues.apache.org/jira/browse/HIVE-23204]) comes, and > the ptest modifications can be reverted, and the server can be restarted > again. -- This message was sent by Atlassian Jira (v8.3.4#803005)