[ https://issues.apache.org/jira/browse/HIVE-23030?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=17071022#comment-17071022 ]
Hive QA commented on HIVE-23030: -------------------------------- Here are the results of testing the latest attachment: https://issues.apache.org/jira/secure/attachment/12998196/HIVE-23030.05.patch {color:green}SUCCESS:{color} +1 due to 1 test(s) being added or modified. {color:red}ERROR:{color} -1 due to 2 failed/errored test(s), 18127 tests executed *Failed tests:* {noformat} TestMiniLlapCliDriver - did not produce a TEST-*.xml file (likely timed out) (batchId=162) [unionDistinct_1.q,table_nonprintable.q,file_with_header_footer_aggregation.q,orc_llap_counters1.q,mm_cttas.q,whroot_external1.q,global_limit.q,rcfile_createas1.q,dynamic_partition_pruning_2.q,intersect_merge.q,parquet_struct_type_vectorization.q,results_cache_diff_fs.q,parallel_colstats.q,load_hdfs_file_with_space_in_the_name.q,orc_merge3.q] org.apache.hadoop.hive.cli.TestMiniLlapLocalCliDriver.testCliDriver[vector_orc_nested_column_pruning] (batchId=172) {noformat} Test results: https://builds.apache.org/job/PreCommit-HIVE-Build/21335/testReport Console output: https://builds.apache.org/job/PreCommit-HIVE-Build/21335/console Test logs: http://104.198.109.242/logs/PreCommit-HIVE-Build-21335/ Messages: {noformat} Executing org.apache.hive.ptest.execution.TestCheckPhase Executing org.apache.hive.ptest.execution.PrepPhase Executing org.apache.hive.ptest.execution.YetusPhase Executing org.apache.hive.ptest.execution.ExecutionPhase Executing org.apache.hive.ptest.execution.ReportingPhase Tests exited with: TestsFailedException: 2 tests failed {noformat} This message is automatically generated. ATTACHMENT ID: 12998196 - PreCommit-HIVE-Build > Enable sketch union-s to be rolled up > ------------------------------------- > > Key: HIVE-23030 > URL: https://issues.apache.org/jira/browse/HIVE-23030 > Project: Hive > Issue Type: Sub-task > Reporter: Zoltan Haindrich > Assignee: Zoltan Haindrich > Priority: Major > Labels: pull-request-available > Attachments: HIVE-23030.01.patch, HIVE-23030.02.patch, > HIVE-23030.03.patch, HIVE-23030.04.patch, HIVE-23030.04.patch, > HIVE-23030.05.patch > > Time Spent: 4.5h > Remaining Estimate: 0h > > Enabling rolling up sketch aggregates could enable the matching of > materialized views created for higher dimensions to be applied for lower > dimension cases. -- This message was sent by Atlassian Jira (v8.3.4#803005)