[ https://issues.apache.org/jira/browse/HIVE-22842?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=17067874#comment-17067874 ]
Hive QA commented on HIVE-22842: -------------------------------- Here are the results of testing the latest attachment: https://issues.apache.org/jira/secure/attachment/12997786/HIVE-22842.04.patch {color:green}SUCCESS:{color} +1 due to 1 test(s) being added or modified. {color:red}ERROR:{color} -1 due to 1 failed/errored test(s), 18161 tests executed *Failed tests:* {noformat} org.apache.hive.jdbc.TestTriggersTezSessionPoolManager.testTriggerHighBytesRead (batchId=292) {noformat} Test results: https://builds.apache.org/job/PreCommit-HIVE-Build/21281/testReport Console output: https://builds.apache.org/job/PreCommit-HIVE-Build/21281/console Test logs: http://104.198.109.242/logs/PreCommit-HIVE-Build-21281/ Messages: {noformat} Executing org.apache.hive.ptest.execution.TestCheckPhase Executing org.apache.hive.ptest.execution.PrepPhase Executing org.apache.hive.ptest.execution.YetusPhase Executing org.apache.hive.ptest.execution.ExecutionPhase Executing org.apache.hive.ptest.execution.ReportingPhase Tests exited with: TestsFailedException: 1 tests failed {noformat} This message is automatically generated. ATTACHMENT ID: 12997786 - PreCommit-HIVE-Build > Timestamp/date vectors in Arrow serializer should use correct calendar for > value representation > ----------------------------------------------------------------------------------------------- > > Key: HIVE-22842 > URL: https://issues.apache.org/jira/browse/HIVE-22842 > Project: Hive > Issue Type: Improvement > Reporter: Jesus Camacho Rodriguez > Assignee: Shubham Chaurasia > Priority: Major > Labels: pull-request-available > Attachments: HIVE-22842.01.patch, HIVE-22842.02.patch, > HIVE-22842.03.patch, HIVE-22842.04.patch > > Time Spent: 10m > Remaining Estimate: 0h > -- This message was sent by Atlassian Jira (v8.3.4#803005)