[ 
https://issues.apache.org/jira/browse/HIVE-11689?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=14721065#comment-14721065
 ] 

Hive QA commented on HIVE-11689:
--------------------------------



{color:red}Overall{color}: -1 at least one tests failed

Here are the results of testing the latest attachment:
https://issues.apache.org/jira/secure/attachment/12753108/HIVE-11689.patch

{color:red}ERROR:{color} -1 due to 5 failed/errored test(s), 9380 tests executed
*Failed tests:*
{noformat}
org.apache.hadoop.hive.cli.TestMiniTezCliDriver.testCliDriver_mergejoin
org.apache.hadoop.hive.cli.TestMiniTezCliDriver.testCliDriver_vector_leftsemi_mapjoin
org.apache.hadoop.hive.cli.TestMiniTezCliDriver.testCliDriver_vectorized_bucketmapjoin1
org.apache.hadoop.hive.cli.TestMiniTezCliDriver.testCliDriver_vectorized_dynamic_partition_pruning
org.apache.hive.hcatalog.api.TestHCatClient.testTableSchemaPropagation
{noformat}

Test results: 
http://ec2-174-129-184-35.compute-1.amazonaws.com/jenkins/job/PreCommit-HIVE-TRUNK-Build/5113/testReport
Console output: 
http://ec2-174-129-184-35.compute-1.amazonaws.com/jenkins/job/PreCommit-HIVE-TRUNK-Build/5113/console
Test logs: 
http://ec2-174-129-184-35.compute-1.amazonaws.com/logs/PreCommit-HIVE-TRUNK-Build-5113/

Messages:
{noformat}
Executing org.apache.hive.ptest.execution.PrepPhase
Executing org.apache.hive.ptest.execution.ExecutionPhase
Executing org.apache.hive.ptest.execution.ReportingPhase
Tests exited with: TestsFailedException: 5 tests failed
{noformat}

This message is automatically generated.

ATTACHMENT ID: 12753108 - PreCommit-HIVE-TRUNK-Build

> minor flow changes to ORC split generation
> ------------------------------------------
>
>                 Key: HIVE-11689
>                 URL: https://issues.apache.org/jira/browse/HIVE-11689
>             Project: Hive
>          Issue Type: Bug
>            Reporter: Sergey Shelukhin
>            Assignee: Sergey Shelukhin
>         Attachments: HIVE-11689.patch
>
>
> There are two changes that would help future work on split PPD into HBase 
> metastore. 
> 1) Move non-HDFS split strategy determination logic into main thread from 
> threadpool.
> 2) Instead of iterating thru the futures and waiting, use CompletionService 
> to get futures in order of completion. That might be useful by itself.



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)

Reply via email to