[ 
https://issues.apache.org/jira/browse/HIVE-22068?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=16906001#comment-16906001
 ] 

Hive QA commented on HIVE-22068:
--------------------------------



Here are the results of testing the latest attachment:
https://issues.apache.org/jira/secure/attachment/12977451/HIVE-22068.04.patch

{color:green}SUCCESS:{color} +1 due to 1 test(s) being added or modified.

{color:green}SUCCESS:{color} +1 due to 16735 tests passed

Test results: 
https://builds.apache.org/job/PreCommit-HIVE-Build/18321/testReport
Console output: https://builds.apache.org/job/PreCommit-HIVE-Build/18321/console
Test logs: http://104.198.109.242/logs/PreCommit-HIVE-Build-18321/

Messages:
{noformat}
Executing org.apache.hive.ptest.execution.TestCheckPhase
Executing org.apache.hive.ptest.execution.PrepPhase
Executing org.apache.hive.ptest.execution.YetusPhase
Executing org.apache.hive.ptest.execution.ExecutionPhase
Executing org.apache.hive.ptest.execution.ReportingPhase
{noformat}

This message is automatically generated.

ATTACHMENT ID: 12977451 - PreCommit-HIVE-Build

> Add more logging to notification cleaner and replication to track events
> ------------------------------------------------------------------------
>
>                 Key: HIVE-22068
>                 URL: https://issues.apache.org/jira/browse/HIVE-22068
>             Project: Hive
>          Issue Type: Improvement
>            Reporter: Ashutosh Bapat
>            Assignee: Ashutosh Bapat
>            Priority: Major
>              Labels: pull-request-available
>         Attachments: HIVE-22068.01.patch, HIVE-22068.02.patch, 
> HIVE-22068.03.patch, HIVE-22068.04.patch
>
>          Time Spent: 10m
>  Remaining Estimate: 0h
>
> * Add more logging to DB notification listener cleaner thread
>  ** The time when it considered cleaning, the interval and time before which 
> events were cleared, the min and max id at that time
>  ** how many events were cleared
>  ** min and max id after the cleaning.
>  * In REPL::START document the starting event, end event if specified and the 
> maximum number of events, if specified.



--
This message was sent by Atlassian JIRA
(v7.6.14#76016)

Reply via email to