[ https://issues.apache.org/jira/browse/HIVE-21007?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=16712282#comment-16712282 ]
Hive QA commented on HIVE-21007: -------------------------------- Here are the results of testing the latest attachment: https://issues.apache.org/jira/secure/attachment/12950919/HIVE-21007.4.patch {color:red}ERROR:{color} -1 due to no test(s) being added or modified. {color:red}ERROR:{color} -1 due to 4 failed/errored test(s), 15650 tests executed *Failed tests:* {noformat} org.apache.hadoop.hive.cli.TestMiniLlapLocalCliDriver.testCliDriver[cbo_rp_limit] (batchId=171) org.apache.hive.jdbc.TestTriggersTezSessionPoolManager.testTriggerCustomCreatedDynamicPartitions (batchId=256) org.apache.hive.jdbc.TestTriggersTezSessionPoolManager.testTriggerCustomCreatedDynamicPartitionsUnionAll (batchId=256) org.apache.hive.jdbc.TestTriggersTezSessionPoolManager.testTriggerHighShuffleBytes (batchId=256) {noformat} Test results: https://builds.apache.org/job/PreCommit-HIVE-Build/15201/testReport Console output: https://builds.apache.org/job/PreCommit-HIVE-Build/15201/console Test logs: http://104.198.109.242/logs/PreCommit-HIVE-Build-15201/ Messages: {noformat} Executing org.apache.hive.ptest.execution.TestCheckPhase Executing org.apache.hive.ptest.execution.PrepPhase Executing org.apache.hive.ptest.execution.YetusPhase Executing org.apache.hive.ptest.execution.ExecutionPhase Executing org.apache.hive.ptest.execution.ReportingPhase Tests exited with: TestsFailedException: 4 tests failed {noformat} This message is automatically generated. ATTACHMENT ID: 12950919 - PreCommit-HIVE-Build > Semi join + Union can lead to wrong plans > ----------------------------------------- > > Key: HIVE-21007 > URL: https://issues.apache.org/jira/browse/HIVE-21007 > Project: Hive > Issue Type: Bug > Reporter: Vineet Garg > Assignee: Vineet Garg > Priority: Major > Attachments: HIVE-21007.1.patch, HIVE-21007.2.patch, > HIVE-21007.3.patch, HIVE-21007.4.patch > > > Tez compiler has the ability to push JOIN within UNION (by replicating join > on each branch). If this JOIN had a SJ branch outgoing (or incoming) it could > mess up the plan and end up generating incorrect or wrong plan. > As a safe measure any SJ branch after UNION should be removed (until we > improve the logic to better handle SJ branches) -- This message was sent by Atlassian JIRA (v7.6.3#76005)