[ 
https://issues.apache.org/jira/browse/HIVE-20778?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=16673332#comment-16673332
 ] 

Hive QA commented on HIVE-20778:
--------------------------------



Here are the results of testing the latest attachment:
https://issues.apache.org/jira/secure/attachment/12946238/HIVE-20778.5.patch

{color:green}SUCCESS:{color} +1 due to 2 test(s) being added or modified.

{color:red}ERROR:{color} -1 due to 3 failed/errored test(s), 15518 tests 
executed
*Failed tests:*
{noformat}
TestMiniDruidCliDriver - did not produce a TEST-*.xml file (likely timed out) 
(batchId=196)
        
[druidmini_masking.q,druidmini_test1.q,druidkafkamini_basic.q,druidmini_joins.q,druid_timestamptz.q]
org.apache.hadoop.hive.cli.TestSparkCliDriver.testCliDriver[subquery_notin] 
(batchId=142)
org.apache.hadoop.hive.cli.TestSparkCliDriver.testCliDriver[subquery_select] 
(batchId=128)
{noformat}

Test results: 
https://builds.apache.org/job/PreCommit-HIVE-Build/14706/testReport
Console output: https://builds.apache.org/job/PreCommit-HIVE-Build/14706/console
Test logs: http://104.198.109.242/logs/PreCommit-HIVE-Build-14706/

Messages:
{noformat}
Executing org.apache.hive.ptest.execution.TestCheckPhase
Executing org.apache.hive.ptest.execution.PrepPhase
Executing org.apache.hive.ptest.execution.YetusPhase
Executing org.apache.hive.ptest.execution.ExecutionPhase
Executing org.apache.hive.ptest.execution.ReportingPhase
Tests exited with: TestsFailedException: 3 tests failed
{noformat}

This message is automatically generated.

ATTACHMENT ID: 12946238 - PreCommit-HIVE-Build

> Join reordering may not be triggered if all joins in plan are created by 
> decorrelation logic
> --------------------------------------------------------------------------------------------
>
>                 Key: HIVE-20778
>                 URL: https://issues.apache.org/jira/browse/HIVE-20778
>             Project: Hive
>          Issue Type: Bug
>          Components: CBO
>            Reporter: Jesus Camacho Rodriguez
>            Assignee: Vineet Garg
>            Priority: Major
>         Attachments: HIVE-20778.1.patch, HIVE-20778.2.patch, 
> HIVE-20778.3.patch, HIVE-20778.4.patch, HIVE-20778.5.patch
>
>




--
This message was sent by Atlassian JIRA
(v7.6.3#76005)

Reply via email to