[ 
https://issues.apache.org/jira/browse/HIVE-20629?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=16627375#comment-16627375
 ] 

Hive QA commented on HIVE-20629:
--------------------------------



Here are the results of testing the latest attachment:
https://issues.apache.org/jira/secure/attachment/12941155/HIVE-20629.01.patch

{color:green}SUCCESS:{color} +1 due to 1 test(s) being added or modified.

{color:green}SUCCESS:{color} +1 due to 14997 tests passed

Test results: 
https://builds.apache.org/job/PreCommit-HIVE-Build/14038/testReport
Console output: https://builds.apache.org/job/PreCommit-HIVE-Build/14038/console
Test logs: http://104.198.109.242/logs/PreCommit-HIVE-Build-14038/

Messages:
{noformat}
Executing org.apache.hive.ptest.execution.TestCheckPhase
Executing org.apache.hive.ptest.execution.PrepPhase
Executing org.apache.hive.ptest.execution.YetusPhase
Executing org.apache.hive.ptest.execution.ExecutionPhase
Executing org.apache.hive.ptest.execution.ReportingPhase
{noformat}

This message is automatically generated.

ATTACHMENT ID: 12941155 - PreCommit-HIVE-Build

> Hive incremental replication fails with events missing error if database is 
> kept idle for more than an hour 
> ------------------------------------------------------------------------------------------------------------
>
>                 Key: HIVE-20629
>                 URL: https://issues.apache.org/jira/browse/HIVE-20629
>             Project: Hive
>          Issue Type: Bug
>          Components: repl
>    Affects Versions: 4.0.0
>            Reporter: mahesh kumar behera
>            Assignee: mahesh kumar behera
>            Priority: Major
>              Labels: pull-request-available
>             Fix For: 4.0.0
>
>         Attachments: HIVE-20629.01.patch
>
>
> Start a source cluster with 2 database. Replicate the databases to target 
> after doing some operations. Keep taking incremental dump for both database 
> and keep replicating them to target cluster. Keep one the database idle for 
> more than 24 hrs. After 24 hrs, the incremental dump of idle database fails 
> with event missing error.



--
This message was sent by Atlassian JIRA
(v7.6.3#76005)

Reply via email to