[ 
https://issues.apache.org/jira/browse/HIVE-19571?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=16497319#comment-16497319
 ] 

Deepak Jaiswal commented on HIVE-19571:
---------------------------------------

[~stakiar] thanks for working on it. I would like to lend my hand in this 
effort.

> Ability to run multiple pre-commit jobs on a ptest server
> ---------------------------------------------------------
>
>                 Key: HIVE-19571
>                 URL: https://issues.apache.org/jira/browse/HIVE-19571
>             Project: Hive
>          Issue Type: Sub-task
>          Components: Testing Infrastructure
>            Reporter: Sahil Takiar
>            Assignee: Sahil Takiar
>            Priority: Major
>         Attachments: HIVE-17317.WIP.1.patch
>
>
> I've been taking a look at the Disk, Network, and CPU usage of the GCE 
> instances we run ptest on, and it doesn't look like we are fully utilizing 
> the machines. The resource usage is very up and down.
> During each ptest execution, there is a large chunk of time (~20 min) where 
> its just the Jenkins job that is doing any work (checking out github repos, 
> building code, figuring out test batches, etc.). During this time, the ptest 
> nodes are mostly idle - the CPU and Disk I/O are almost zero.
> Even when ptest is running, I think some of resources are under-utilized. 
> Network and disk resource spike at the beginning of the job, probably because 
> ptest is distributing resources to each machine, each slave is downloading 
> jars, etc. However, after that, when the actual tests run, there is almost 0 
> network activity (which makes sense since tests runs on a single node). For 
> disk usage, there is activity, but not nearly as high as when the setup phase 
> was occuring. CPU usage fluctuates between 40-80%.



--
This message was sent by Atlassian JIRA
(v7.6.3#76005)

Reply via email to