Vihang Karajgaonkar commented on HIVE-19505:
--------------------------------------------

Changing from 2 to 3 didn't help much. The execution phase came down from ~1 hr 
30 min to ~ 1hr 20 min.  Ideally should have been close to ~1hr. This shows 
that the bottleneck is may be some where else. I think we are spending a lot of 
time copying the files which are close to 20G. See HIVE-19487

> Increase number of parallel runs from 2 per node to 4
> -----------------------------------------------------
>
>                 Key: HIVE-19505
>                 URL: https://issues.apache.org/jira/browse/HIVE-19505
>             Project: Hive
>          Issue Type: Sub-task
>            Reporter: Vihang Karajgaonkar
>            Assignee: Vihang Karajgaonkar
>            Priority: Major
>
> The test cluster is under utilized. For the short run we can increase the 
> parallel threads from 2 to 3 (or may be 4) which will speedup parallel test 
> batches.



--