Mikhail Antonov commented on HBASE-16074:
-----------------------------------------

You mean eight unreferenced nodes were with normal in-Loop run w/ Monkeys and 
the last step was w/o them?

With the last patch half of the runs failed for me with the same errors (seems 
to be it happens less often not, though I'm not sure which one I like more - 
the bug which causes data loss always or in half runs..yeah). Also tried to 
revert the patch and run w/o it. Saw 4 or 5 successful runs so far, none failed.

> ITBLL fails, reports lost big or tiny families
> ----------------------------------------------
>
>                 Key: HBASE-16074
>                 URL: https://issues.apache.org/jira/browse/HBASE-16074
>             Project: HBase
>          Issue Type: Bug
>          Components: integration tests
>    Affects Versions: 1.3.0, 0.98.20
>            Reporter: Mikhail Antonov
>            Assignee: Mikhail Antonov
>            Priority: Blocker
>             Fix For: 2.0.0, 1.3.0, 1.4.0, 0.98.21
>
>         Attachments: 16074.test.branch-1.3.patch, 16074.test.patch, 
> HBASE-16074.branch-1.3.001.patch, HBASE-16074.branch-1.3.002.patch, 
> HBASE-16074.branch-1.3.003.patch, HBASE-16074.branch-1.3.003.patch, 
> changes_to_stress_ITBLL.patch, changes_to_stress_ITBLL__a_bit_relaxed_.patch, 
> itbll log with failure, itbll log with success
>
>
> Underlying MR jobs succeed but I'm seeing the following in the logs (mid-size 
> distributed test cluster):
> ERROR test.IntegrationTestBigLinkedList$Verify: Found nodes which lost big or 
> tiny families, count=164
> I do not know exactly yet whether it's a bug, a test issue or env setup 
> issue, but need figure it out. Opening this to raise awareness and see if 
> someone saw that recently.



--