[
https://issues.apache.org/jira/browse/HBASE-16074?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=15361787#comment-15361787
]
Mikhail Antonov commented on HBASE-16074:
-----------------------------------------
You mean eight unreferenced nodes were with normal in-Loop run w/ Monkeys and
the last step was w/o them?
With the last patch half of the runs failed for me with the same errors (seems
to be it happens less often not, though I'm not sure which one I like more -
the bug which causes data loss always or in half runs..yeah). Also tried to
revert the patch and run w/o it. Saw 4 or 5 successful runs so far, none failed.
> ITBLL fails, reports lost big or tiny families
> ----------------------------------------------
>
> Key: HBASE-16074
> URL: https://issues.apache.org/jira/browse/HBASE-16074
> Project: HBase
> Issue Type: Bug
> Components: integration tests
> Affects Versions: 1.3.0, 0.98.20
> Reporter: Mikhail Antonov
> Assignee: Mikhail Antonov
> Priority: Blocker
> Fix For: 2.0.0, 1.3.0, 1.4.0, 0.98.21
>
> Attachments: 16074.test.branch-1.3.patch, 16074.test.patch,
> HBASE-16074.branch-1.3.001.patch, HBASE-16074.branch-1.3.002.patch,
> HBASE-16074.branch-1.3.003.patch, HBASE-16074.branch-1.3.003.patch,
> changes_to_stress_ITBLL.patch, changes_to_stress_ITBLL__a_bit_relaxed_.patch,
> itbll log with failure, itbll log with success
>
>
> Underlying MR jobs succeed but I'm seeing the following in the logs (mid-size
> distributed test cluster):
> ERROR test.IntegrationTestBigLinkedList$Verify: Found nodes which lost big or
> tiny families, count=164
> I do not know exactly yet whether it's a bug, a test issue or env setup
> issue, but need figure it out. Opening this to raise awareness and see if
> someone saw that recently.
--
This message was sent by Atlassian JIRA
(v6.3.4#6332)