Can I have a review please? Just adding a few tests that later code, the last
part of this big patch needs. Thanks.
The timed out test is unrelated. Let me retry in the meantime.
> HBASE-15158 Preamble 2 of 2:Add Increment tests
> -----------------------------------------------
>
> Key: HBASE-15196
> URL: https://issues.apache.org/jira/browse/HBASE-15196
> Project: HBase
> Issue Type: Bug
> Reporter: stack
> Assignee: stack
> Attachments: 15196.patch, 15196v2.patch, 15196v3.patch, 15196v3.patch
>
>
> Add the tests that were added by parent issue HBASE-15158; adds
> IncrementPerformanceTest, TestRegionIncrement, and moves Increment testing
> 'from client side' out into own test suite. This stuff is mostly forward-post
> of tests committed to branch-1 to test increment regressions 'narorow' fix
> (See HBASE-15031). We are adding the tests separately here in an effort at
> making the HBASE-15158 patch smaller. This is preamble 2 of 2. Preamble 1 was
> HBASE-15186
--