[ 
https://issues.apache.org/jira/browse/FLINK-6089?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

Shaoxuan Wang reassigned FLINK-6089:
------------------------------------

    Assignee: Hequn Cheng  (was: Shaoxuan Wang)

> Implement decoration phase for rewriting predicated logical plan after 
> volcano optimization phase
> -------------------------------------------------------------------------------------------------
>
>                 Key: FLINK-6089
>                 URL: https://issues.apache.org/jira/browse/FLINK-6089
>             Project: Flink
>          Issue Type: Sub-task
>            Reporter: Shaoxuan Wang
>            Assignee: Hequn Cheng
>
> At present, there is no chance to modify the DataStreamRel tree after the 
> volcano optimization. We consider to add a decoration phase after volcano 
> optimization phase. Decoration phase is dedicated for rewriting predicated 
> logical plan and is independent of cost module. After decoration phase is 
> added, we get the chance to apply retraction rules at this phase.



--
This message was sent by Atlassian JIRA
(v6.3.15#6346)

Reply via email to