Ahmed Hamdy created FLINK-40695:
-----------------------------------

             Summary: Transient issues during ExecutionGraph creation lead to 
terminal job Failure
                 Key: FLINK-40695
                 URL: https://issues.apache.org/jira/browse/FLINK-40695
             Project: Flink
          Issue Type: Bug
          Components: Runtime / Coordination
    Affects Versions: 2.2.1
            Reporter: Ahmed Hamdy


During job submission or rescaling the AdaptiveScheduler moves to 
{{CreatingExecutionGraph}} state which handles failures by moving to the 
terminal {{Failed}} state. Failures in execution graph creation can be 
transient or retryable like network issues preparing checkpoint directories.

h2. Acceptance Criteria

Introduce a retry mechanism for ExecutionGraph creation



--
This message was sent by Atlassian Jira
(v8.20.10#820010)

Reply via email to