[
https://issues.apache.org/jira/browse/FLINK-40451?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]
ASF GitHub Bot updated FLINK-40451:
-----------------------------------
Labels: pull-request-available (was: )
> E2E test timeout keeps CI running until the timeout ends, even after the test
> passes
> ------------------------------------------------------------------------------------
>
> Key: FLINK-40451
> URL: https://issues.apache.org/jira/browse/FLINK-40451
> Project: Flink
> Issue Type: Technical Debt
> Components: Build System / CI
> Reporter: Sergey Nuyanzin
> Assignee: Sergey Nuyanzin
> Priority: Major
> Labels: pull-request-available
>
> When an end-to-end test starts, it also starts a hidden sleep timer (e.g.
> 900s) as a safety timeout. When the test passes early, we stop the timer's
> watchdog — but the sleep itself keeps running. That leftover sleep holds the
> CI output pipe open, so the CI step can't finish until the full timeout ends.
> Example:
> https://dev.azure.com/apache-flink/apache-flink/_build/results?buildId=78243&view=logs&j=af184cdd-c6d8-5084-0b69-7e9c67b35f7a&t=0f3adb59-eefa-51c6-2858-3654d9e0749d&l=1378
> the job logged
> {noformat}
> rm: cannot remove
> '/home/vsts/work/1/s/flink-end-to-end-tests/test-scripts/temp-test-directory-52939195255/tmp/backup':
> No such file or directory
> {noformat}
> however finally completed 12+ mins after that because of timeout mentioned
> above
--
This message was sent by Atlassian Jira
(v8.20.10#820010)