[
https://issues.apache.org/jira/browse/FLINK-40010?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]
Martijn Visser resolved FLINK-40010.
------------------------------------
Fix Version/s: 2.4.0
Resolution: Fixed
Fixed in apache/flink:master ad2dee480a697d831d79ca1fd6cc501b198c7765
> RescaleTimelineITCase.testRescaleTerminatedByNoResourcesOrNoParallelismsChange
> is flaky: requirements-update can miss the in-progress rescale
> ---------------------------------------------------------------------------------------------------------------------------------------------
>
> Key: FLINK-40010
> URL: https://issues.apache.org/jira/browse/FLINK-40010
> Project: Flink
> Issue Type: Bug
> Components: Runtime / Coordination, Tests
> Affects Versions: 2.4.0
> Reporter: Martijn Visser
> Assignee: Martijn Visser
> Priority: Major
> Fix For: 2.4.0
>
>
> testRescaleTerminatedByNoResourcesOrNoParallelismsChange fails on CI: the
> awaited
> terminal reason NO_RESOURCES_OR_PARALLELISMS_CHANGE is never recorded, so the
> wait times out (or, before https://issues.apache.org/jira/browse/FLINK-40009,
> hangs).
> https://dev.azure.com/apache-flink/apache-flink/_build/results?buildId=76350&view=results
> (leg: test_cron_azure core)
> https://dev.azure.com/apache-flink/apache-flink/_build/results?buildId=76242&view=results
> (leg: test_cron_jdk11 core)
> Root cause: NO_RESOURCES_OR_PARALLELISMS_CHANGE is stamped by
> DefaultStateTransitionManager only on the rescale tracked when the manager
> (re-)enters its Idling phase. With the short shared cooldown, the cooldown
> can elapse
> and the manager can reach Idling before the requirements-update RPC is
> processed, so the UPDATE_REQUIREMENT rescale is created after Idling was
> entered and never receives the terminal reason; it stays in-progress until
> teardown cancels it (JOB_CANCELED).
> Fix: rebuild the fixture cluster with a cooldown (10s) that comfortably
> outlasts the
> synchronous update RPC, so the update is processed in Cooldown and routed
> back through Idling where the reason is stamped. Unlike
> testRescaleTerminatedByResourceRequirementsUpdated (FLINK-39903), this case
> must wait out the whole cooldown before the condition can be met, so the
> cooldown is kept modest (10s) and the wait budget is widened to 60s.
> Related: FLINK-39902, FLINK-39903 (sibling races in the same class).
--
This message was sent by Atlassian Jira
(v8.20.10#820010)