Matthias Pohl created FLINK-33276:
-------------------------------------

             Summary: Reorganize CI stages
                 Key: FLINK-33276
                 URL: https://issues.apache.org/jira/browse/FLINK-33276
             Project: Flink
          Issue Type: Technical Debt
          Components: Build System / CI
    Affects Versions: 1.17.1, 1.16.2, 1.18.0, 1.19.0
            Reporter: Matthias Pohl


{{connect_2}} stage became obsolete due to the externalization of the 
connectors. We can merge {{connect_1}} and {{connect_2}} again into a single 
{{connect}} stage (and maybe rename it into something more meaningful?)



--
This message was sent by Atlassian Jira
(v8.20.10#820010)

Reply via email to