[ https://issues.apache.org/jira/browse/FLINK-30685?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Zhu Zhu reassigned FLINK-30685: ------------------------------- Assignee: Junrui Li > Support mark the transformations whose parallelism is infected by the input > transformation > ------------------------------------------------------------------------------------------ > > Key: FLINK-30685 > URL: https://issues.apache.org/jira/browse/FLINK-30685 > Project: Flink > Issue Type: Sub-task > Components: Runtime / Coordination > Reporter: Junrui Li > Assignee: Junrui Li > Priority: Major > Fix For: 1.17.0 > > > In order to chain operators together as much as possible, many downstream > operators will use the parallelism of upstream input operators in the table > planner. > If some operators need to have their own defined parallelism, the parallelism > will be explicitly set. Therefore, the operator that takes the parallelism of > the upstream operator as its own parallelism should be automatically derived > by the AdaptiveBatchScheduler. -- This message was sent by Atlassian Jira (v8.20.10#820010)