[ 
https://issues.apache.org/jira/browse/FLINK-30685?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

Zhu Zhu reassigned FLINK-30685:
-------------------------------

    Assignee: Junrui Li

> Support mark the transformations whose parallelism is infected by the input 
> transformation
> ------------------------------------------------------------------------------------------
>
>                 Key: FLINK-30685
>                 URL: https://issues.apache.org/jira/browse/FLINK-30685
>             Project: Flink
>          Issue Type: Sub-task
>          Components: Runtime / Coordination
>            Reporter: Junrui Li
>            Assignee: Junrui Li
>            Priority: Major
>             Fix For: 1.17.0
>
>
> In order to chain operators together as much as possible, many downstream 
> operators will use the parallelism of upstream input operators in the table 
> planner.
> If some operators need to have their own defined parallelism, the parallelism 
> will be explicitly set. Therefore, the operator that takes the parallelism of 
> the upstream operator as its own parallelism should be automatically derived 
> by the AdaptiveBatchScheduler.



--
This message was sent by Atlassian Jira
(v8.20.10#820010)

Reply via email to