[ https://issues.apache.org/jira/browse/FLINK-26517?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Lijie Wang updated FLINK-26517: ------------------------------- Description: As describe in FLINK-26330, in order to make the number of subpartitoins evenly consumed by downstream tasks, we need to normalize the decided parallelism to 2^N. > Normalize the decided parallelism to power of 2 when using adaptive batch > scheduler > ----------------------------------------------------------------------------------- > > Key: FLINK-26517 > URL: https://issues.apache.org/jira/browse/FLINK-26517 > Project: Flink > Issue Type: Bug > Components: Runtime / Coordination > Reporter: Lijie Wang > Priority: Major > Fix For: 1.15.0 > > > As describe in FLINK-26330, in order to make the number of subpartitoins > evenly consumed by downstream tasks, we need to normalize the decided > parallelism to 2^N. -- This message was sent by Atlassian Jira (v8.20.1#820001)