[ 
https://issues.apache.org/jira/browse/FLINK-19533?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

Arvid Heise resolved FLINK-19533.
---------------------------------
    Fix Version/s: 1.12.0
       Resolution: Fixed

> Add state assignment to channel state during rescaling
> ------------------------------------------------------
>
>                 Key: FLINK-19533
>                 URL: https://issues.apache.org/jira/browse/FLINK-19533
>             Project: Flink
>          Issue Type: Sub-task
>          Components: Runtime / Checkpointing
>    Affects Versions: 1.12.0
>            Reporter: Arvid Heise
>            Assignee: Arvid Heise
>            Priority: Major
>              Labels: pull-request-available
>             Fix For: 1.12.0
>
>
> Enhance StateAssignmentOperation to create a channel state mapping during 
> rescaling, where channels before rescaling are mapped to channels after 
> rescaling.
> Example:
> Before rescaling: parallelism of 2, channel 0 = key group range [0,64), 
> channel 1 = key group range [64,128)
> After rescaling: parallelism of 3, channel 0 = key group range [0,43), 
> channel 1 = key group range [43,86), channel 2 = key group range [86,128)
> Mapping: 0 -> [0, 1], 1 -> [1, 2]
>  
> The mapping is passed to the respective channels through deployment 
> descriptors. It will be used in a separate ticket to restore the correct 
> buffers from pre-rescaling channels to post-rescaling channels.



--
This message was sent by Atlassian Jira
(v8.3.4#803005)

Reply via email to