[ 
https://issues.apache.org/jira/browse/FLINK-16795?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=17136367#comment-17136367
 ] 

Robert Metzger commented on FLINK-16795:
----------------------------------------

[~becket_qin] thanks a lot for posting the updated link here. From my analysis 
so far, I assume this has been caused by slow download speeds from the Azure VM.
Our current CI setup has the download logs disabled. If we such issues more 
frequently, I'll enable the logs again to get a glimpse what's going on

> End to end tests timeout on Azure
> ---------------------------------
>
>                 Key: FLINK-16795
>                 URL: https://issues.apache.org/jira/browse/FLINK-16795
>             Project: Flink
>          Issue Type: Bug
>          Components: Build System / Azure Pipelines, Tests
>    Affects Versions: 1.11.0
>            Reporter: Robert Metzger
>            Assignee: Robert Metzger
>            Priority: Major
>              Labels: pull-request-available
>         Attachments: image.png
>
>          Time Spent: 20m
>  Remaining Estimate: 0h
>
> Example: 
> https://dev.azure.com/rmetzger/Flink/_build/results?buildId=6650&view=logs&j=08866332-78f7-59e4-4f7e-49a56faa3179
>  or 
> https://dev.azure.com/rmetzger/Flink/_build/results?buildId=6637&view=logs&j=c88eea3b-64a0-564d-0031-9fdcd7b8abee&t=1e2bbe5b-4657-50be-1f07-d84bfce5b1f5
> {code}##[error]The job running on agent Azure Pipelines 6 ran longer than the 
> maximum time of 200 minutes. For more information, see 
> https://go.microsoft.com/fwlink/?linkid=2077134
> {code}
> and {code}##[error]The operation was canceled.{code}



--
This message was sent by Atlassian Jira
(v8.3.4#803005)

Reply via email to