[ https://issues.apache.org/jira/browse/FLINK-12229?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=16833241#comment-16833241 ]
ryantaocer edited comment on FLINK-12229 at 5/5/19 6:40 AM: ------------------------------------------------------------ Maybe we could introduce a new trigger {{PROGRESS}} the percentage of which the input result partitions have finished to schedule each downstream consumer task. This {{PROGRESS}} parameter is of range 0~1, and 0 corrresponds to current {{ANY}} and 1 corresponds to current {{ALL}} respectively. In practice, it can be configured to about 1 saying 0.8 to balance the speedup advantage and possible resource deadlock. was (Author: ryantaocer): Maybe we could introduce a new scheduling trigger {{PROGRESS}} the percentage of which the input result partitions have finished to schedule each downstream consumer task. This {{PROGRESS}} parameter is of range 0~1, and 0 corrresponds to current {{ANY}} and 1 corresponds to current {{ALL}} respectively. In practice, it can be configured to about 1 saying 0.8 to balance the speedup advantage and possible resource deadlock. > Implement Lazy Scheduling Strategy > ---------------------------------- > > Key: FLINK-12229 > URL: https://issues.apache.org/jira/browse/FLINK-12229 > Project: Flink > Issue Type: Sub-task > Components: Runtime / Coordination > Reporter: Gary Yao > Assignee: BoWang > Priority: Major > Labels: pull-request-available > Time Spent: 10m > Remaining Estimate: 0h > > Implement a {{SchedulingStrategy}} that covers the functionality of > {{ScheduleMode.LAZY_FROM_SOURCES}}, i.e., vertices are scheduled when all the > input data are available. > Acceptance Criteria: > * New strategy is tested in isolation using test implementations (i.e., > without having to submit a job) -- This message was sent by Atlassian JIRA (v7.6.3#76005)