[ https://issues.apache.org/jira/browse/FLINK-8978?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Till Rohrmann updated FLINK-8978: --------------------------------- Fix Version/s: (was: 1.5.0) 1.5.1 1.6.0 > End-to-end test: Job upgrade > ---------------------------- > > Key: FLINK-8978 > URL: https://issues.apache.org/jira/browse/FLINK-8978 > Project: Flink > Issue Type: Sub-task > Components: Tests > Affects Versions: 1.5.0 > Reporter: Till Rohrmann > Priority: Blocker > Fix For: 1.6.0, 1.5.1 > > > Job upgrades usually happen during the lifetime of a real world Flink job. > Therefore, we should add an end-to-end test which exactly covers this > scenario. I suggest to do the follwoing: > # run the general purpose testing job FLINK-8971 > # take a savepoint > # Modify the job by introducing a new operator and changing the order of > others > # Resume the modified job from the savepoint > # Verify that everything went correctly -- This message was sent by Atlassian JIRA (v7.6.3#76005)