[ https://issues.apache.org/jira/browse/FLINK-7928?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Till Rohrmann resolved FLINK-7928. ---------------------------------- Resolution: Fixed Fix Version/s: 1.5.0 Fixed via 5643d156cea72314c2240119b30aa32a65a0aeb7 > Extend the filed in ResourceProfile for precisely calculating the resource of > a task manager > -------------------------------------------------------------------------------------------- > > Key: FLINK-7928 > URL: https://issues.apache.org/jira/browse/FLINK-7928 > Project: Flink > Issue Type: Improvement > Components: JobManager, ResourceManager > Reporter: shuai.xu > Assignee: shuai.xu > Labels: flip-6 > Fix For: 1.5.0 > > > ResourceProfile records all the resource requirements for a slot。It is > generated by JobMaster and then passed to ResourceManager with the slot > request. > A task in the slot needs three parts of resource: > 1. The resource for the operators, this is specified by the ResourceSpec user > defined > 2. The resource for the operators to communicating with their upstreams. For > example, the resource for buffer pools and so on. > 3. The resource for the operators to communicating with their downstreams. > Same as above. > So ResourceProfile should contain three parts of resource, the first part > from ResouceSpec, and the other two part be generated by Job Master. -- This message was sent by Atlassian JIRA (v6.4.14#64029)