[ 
https://issues.apache.org/jira/browse/FLEX-35139?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=15643374#comment-15643374
 ] 

Giuseppe Rusciano edited comment on FLEX-35139 at 11/7/16 7:28 AM:
-------------------------------------------------------------------

[~jmclean] Dear, if you write "probabiy" you can't close a feedback with 
resolved!

The medium user try to use this component has serious problem to understand 
your logic. 

The showed value by the user, is strange and incorrect, i.e. if I read 00.40.4 
for me is understandable, so when our Lord hint in my mind.... Joe press TAB 
and the world round on you... I can see the light!

Finally, this strange behaviour happens only in AIR but with Flash Player goes 
OK. So if is correct the AIR behaviour you have a bug in Flash Player because 
it correctly shows 0.4 instread of 00.40.4

Please, if possible reopen this issue


was (Author: joetaras):
[~jmclean] Dear, if you write "probabiy" you can't close a feedback with 
resolved!

The medium user try to use this component has serious problem to understand 
your logic. 

The showed value by the user, is strange and incorrect, i.e. if I read 00.40.4 
for me is understandable, so when our Lord hint in my mind.... Joe press TAB 
and the world round on you... I can see the light!

Please, if possible reopen this issue

> mx:NumericStepper copy paste issue
> ----------------------------------
>
>                 Key: FLEX-35139
>                 URL: https://issues.apache.org/jira/browse/FLEX-35139
>             Project: Apache Flex
>          Issue Type: Bug
>          Components: mx: NumericStepper
>    Affects Versions: Apache Flex 4.15.0
>         Environment: Project AIR 20.0 under Windows platform
>            Reporter: Giuseppe Rusciano
>              Labels: easytest
>
> I have two mx:NumericStepper in my project. I try to copy and past a value as 
> 0.4 from the first numeric stepper into the second.
> Graphically, before focus out fix all, I have this behaviour, in the second 
> numeric stepper I have 00.40.4
> Steps to Reproduce:
> I've created this AIR project:
> <?xml version="1.0" encoding="utf-8"?>
> <s:WindowedApplication xmlns:fx="http://ns.adobe.com/mxml/2009"; 
> xmlns:s="library://ns.adobe.com/flex/spark" 
> xmlns:mx="library://ns.adobe.com/flex/mx">
> <mx:HBox width="100%">
> <mx:NumericStepper id="myNS1" stepSize=".01" width="100"/>
> <mx:NumericStepper id="myNS2" stepSize=".01" width="100"/>
> </mx:HBox>
> </s:WindowedApplication>
> When the project starts:
> 1. I'm writing in the first numeric stepper the value 0.4
> 2. I'm pressing CTRL+A to select all and CTRL + C to copy the value 0.4
> 3. I'm focusing on the second numeric stepper and I'm pressing CTRL + V to 
> paste the value at step 2.
> 4. The graphical output is 00.40.4
> 5. If I'm focusing out from the second numeric stepper, the result becomes 
> 0.4 (correctly)



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)

Reply via email to