[ 
https://issues.apache.org/jira/browse/CAMEL-23899?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

Claus Ibsen updated CAMEL-23899:
--------------------------------
    Issue Type: Test  (was: Bug)

> Flaky test: LogWriterRollOverUpdateAsyncWithContentionTest in camel-wal
> -----------------------------------------------------------------------
>
>                 Key: CAMEL-23899
>                 URL: https://issues.apache.org/jira/browse/CAMEL-23899
>             Project: Camel
>          Issue Type: Test
>            Reporter: Guillaume Nodet
>            Priority: Major
>              Labels: flaky-test
>             Fix For: 4.22.0
>
>
> The test 
> `LogWriterRollOverUpdateAsyncWithContentionTest.testReadWriteUpdateRecordsWithRollOver`
>  in `camel-wal` is flaky in CI.
> Observed failure on JDK 17 in PR #24374 CI run (July 4, 2025). The test 
> involves concurrent write-ahead log operations with contention and roll-over, 
> which is timing-sensitive.
> The test should be stabilized, potentially using Awaitility instead of any 
> timing-dependent assertions.



--
This message was sent by Atlassian Jira
(v8.20.10#820010)

Reply via email to