At long last we're taking down our IBM 2105.  My question has to do with
the fact that the 2105 shares a McData switch with another SAN, and that
other SAN is live production. Powering down the 2105 and carefully
removing the cables and electrical power source should have no negative
effect on the McData switch or second SAN, correct?  All cables and
power feeds are clearly marked, and we readily know which cables are the
correct ones. Anything else we need to be concerned about?        

----------------------------------------------------------------------
For IBM-MAIN subscribe / signoff / archive access instructions,
send email to [email protected] with the message: GET IBM-MAIN INFO
Search the archives at http://bama.ua.edu/archives/ibm-main.html

Reply via email to