Vinayakumar B created HDFS-10614:
------------------------------------

             Summary: Appended blocks can be closed even before IBRs from 
DataNodes
                 Key: HDFS-10614
                 URL: https://issues.apache.org/jira/browse/HDFS-10614
             Project: Hadoop HDFS
          Issue Type: Bug
            Reporter: Vinayakumar B
            Assignee: Vinayakumar B


Scenario:
   1. Open the file for append()
   2. Trigger append pipeline setup by adding some data.
   3. Consider RECEIVING IBRs of DNs reaches NN first.
   4. updatePipeline() rpc sent to namenode to update the pipeline.
   5. Now, if complete() is called on the file even before closing the 
pipeline, then block will be COMPLETE, even before block is actually FINALIZED 
at DN side and file will be closed.



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)

---------------------------------------------------------------------
To unsubscribe, e-mail: hdfs-dev-unsubscr...@hadoop.apache.org
For additional commands, e-mail: hdfs-dev-h...@hadoop.apache.org

Reply via email to