Hello Guix! This ‘core-updates’ cycle was terribly long, so I suggest to write down a schedule and then try hard to stick to it. ;-)
What about this: • May 25th, ‘core-updates’ branch frozen (i.e., rebuild-the-world changes are no longer accepted); • June 15th, ‘core-updates’ merged in ‘master’ (i.e., most regressions compared to ‘master’ have been fixed). How does that sound? If anyone wants to make non-trivial changes in ‘core-updates’, let’s make them as early as possible. I for one would like to finally merge ‘wip-build-systems-gexp’ so I’ll try to do that. There’s also support for response files in ‘ld-wrapper’, but that is easier (see <https://bugs.gnu.org/25882>). Last but not least: who wants to be the timekeeper? The position mostly consists in firmly reminding people of the schedule. :-) Ludo’.