In the twelfth garbage collection of a short program I ran, GC trace 
reports the goal heap size as 735 MB (see below for gc11, gc12 and gc13 
from GC trace)  I also checked runtime Memstats (see attached image), and 
it says the nextGC target after 12 GCs have run is 838103616. 

Should goal Heap Size of GC Trace and NextGC of runtime.Memstats not be the 
same? 


gc 11 @22.009s 0%: 0.004+12+0.034 ms clock, 0.019+0.13/11/0.94+0.13 ms cpu, 
562->562->367 MB, 964 MB goal, 4 P

gc 12 @32.925s 0%: 0.003+16+0.024 ms clock, 0.014+0/3.7/13+0.099 ms cpu, 
410->410->399 MB, 735 MB goal, 4 P (forced)

gc 13 @32.964s 0%: 0.019+21+0.036 ms clock, 0.079+0/21/0.56+0.14 ms cpu, 
400->400->399 MB, 799 MB goal, 4 P (forced)

-- 
You received this message because you are subscribed to the Google Groups 
"golang-nuts" group.
To unsubscribe from this group and stop receiving emails from it, send an email 
to golang-nuts+unsubscr...@googlegroups.com.
To view this discussion on the web visit 
https://groups.google.com/d/msgid/golang-nuts/91aa0a78-7271-43b5-8fb0-be2f5064b265n%40googlegroups.com.

Reply via email to