Hi GMX users

My 2ns simulation crashed accidentally, gmxcheck said my previous simulation
was stopped at 1400 ps, then I used the tpbconv to generate a new tpr to
restart it from the previous ending point:
"tpbconv -f -e -s -o new.tpr"
but I found the output message of tpbconv said:
"1000000 steps (2000 ps) remaining from first run.
Writing statusfile with starting step          0 and length    1000000
steps...
                                time      0.000 and length   2000.000 ps"
and if I use the new.tpr, the simulation will run another 2ns! I doubt that
this new.tpr will restart my simulation from the beginning. Then I tried
-time 1300, -time 1000, -until 2000, the output message was the same.
Did I use the tpbconv in a wrong way?

Thanks in advance!

Yours
Xin
_______________________________________________
gmx-users mailing list    gmx-users@gromacs.org
http://www.gromacs.org/mailman/listinfo/gmx-users
Please search the archive at http://www.gromacs.org/search before posting!
Please don't post (un)subscribe requests to the list. Use the 
www interface or send it to [EMAIL PROTECTED]
Can't post? Read http://www.gromacs.org/mailing_lists/users.php

Reply via email to