will all developers be on a PPMC? I wouldn't think so - I would have thought it would be like a normal TLP, where those who are guiding the project (hopefully nearly all committers - but not necessarily) will be on the PMC.
All active Committers should be on the PPMC, just as all active Committers ought to be on the PMC. As in the case of an established project, there may a period between being granted commit karma and being granted a voting right, but in the case of a PPMC, especially early on, I think that a lower barrier is probably a good thing. But we can leave that to the PPMC, IMO.
OK - This makes sense and is in line with what I expected. I will change the wording slightly in the PPMC wiki doc to reflect.
In the case where the project is to become a sub-project of a landing project, what is the PPMC for?
To provide a management structure for the project, which is under the Incubator PMC, is expected to end up under another PMC, and has some set of Committers.
I've been handling sub-project issues a lot with the XML project, and there is an absolute assumption by the board that the PMC has active oversite of all code-bases in its domain. If that's the case, then part of incubation should actually be to ensure that the landing PMC is fully up to speed with the code-base before hand-over.
In which case, the PPMC should be landing PMC + mentor (which should probably be on PMC anyway!) + incubator PMC members that are interested.
the PMC of the sponsoring project should pretty much be the PPMC
No. At the very least, it would consist of the Incubator PMC and the landing PMC. The landing PMC does not get control until after the project leaves the Incubator. The PPMC provides the structure by which both PMCs participate, along with the project's other Committers.
Ahh - we might be violently agreeing. However, in the case of a sub-project going under an existing landing PMC, then maybe one should expect that the landing PMC does have control, except in strictly defined cases where the Incubator PMC needs to double check. (Release code, status reports etc.)
After all - the PMC is supposed to be already doing this for other sub-projects, so the only thing the Incubator PMC should be doing is double checking the new players are doing the right thing and that nothing is being released under the Apache name until everyone is happy the project is out of incubation.
Additionally - we have said in a couple of places that the PPMC should be making the decisions. The INcubator PMC is simply in on the loop to double check that the ASF is being protected during the incubation period.
Otherwise, we have this thing called the PPMC that is going to be discarded completely when the sub-project gets to its landing PMC - in this case I'm not sure what the value is?
Hopefully the PPMC will be dissolved by merging it with the landing PMC.
Or by simply removing the Incubator PMC members
There is no point in having a "practice" (still hate that word :>)
We dropped the "practice" designation.
So what does the extra "P" stand for now?
Cheers, Berin