On Tue, 19 Jun 2012, William J. Schmidt wrote:

> On Tue, 2012-06-19 at 14:48 +0200, Richard Guenther wrote:
> > On Tue, 19 Jun 2012, William J. Schmidt wrote:
> > 
> > > I remember having this discussion, and I was looking for it to check on
> > > the details, but I can't seem to find it either in my inbox or in the
> > > archives.  Can you please point me to that again?  Sorry for the bother.
> > 
> > It was in the "Correct cost model for strided loads" thread.
> 
> Ah, right, thanks.  I think it will be best to make that a separate
> patch in the series.  Like so:
> 
> (1) Add calls to the new interface without disturbing existing logic;
> modify the profitability algorithms to query the new model for inside
> costs.  Default algorithm for the model is to just sum costs as is done
> today.
> (1a) Split up the cost hooks (one for loads/stores with misalign parm,
> one for vector_stmt with tree_code, etc.).
> (x) Add heuristics to target models as desired.
> (2) Handle the SLP ordering problem.
> (3) Handle outside costs in the target model.
> (4) Remove the now unnecessary cost fields and the calls that set them.
> 
> I'll start work on this series of patches as I have time between other
> projects.

Thanks!
Richard.

Reply via email to